Access the Full Project by Clicking here!
Bidjugde
JOB
Section 18 WWTP Improvements
BID DATE
03/4/15 - 4:00
AGENCY
Bullhead
ESTIMATE
$1,524,000
SCOPE
The primary purpose of this improvements project is to provide additional cleaning options For information or to obtain plans, specifications and bid documents contact Mirna Coronel, Office Specialist, 2355 Trane Road, Bullhead City, Arizona 86442-5966, at phone (928) 763-0128, fax (928) 763-0131 or mcoronel@bullheadcity.com. for the current membrane bioreactor (MBR) system and improve the solids handling process. MBR operation will be enhanced through the construction of a new cleaning tank, allowing for extended Maintenance Clean (MC) and Clean in Place (CIP) operations. A new bypass line will also reduce grease loading from the LS-18-2 lift station, decreasing membrane fouling. Solids handling will be upgraded through the conversion of the existing aeration basin to an aerobic digester/thickener. The sludge drying beds will be resurfaced and have a new drainage system installed. Plant design flows will remain unchanged.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT