Access the Full Project by Clicking here!
Bidjugde
JOB
E 13th Avenue Sidewalk Improvements
BID DATE
11/2/23 - 10:00
AGENCY
Belton
ESTIMATE
n/a
SCOPE
This project includes, but is not limited to: 4-foot wide sidewalk, retaining wall construction, pedestrian ramps, grass sodding, pedestrian crosswalk and bike lane striping, and SWPPP installations. This project provides pedestrian links from the intersection of Main Street (FM 317) to Waco Road (FM 817). https://www.civcastusa.com/project/651744b127e6924738424f2d/summary jsimcik@kpaengineers.com
PREBID
10/17/2023 2:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT