Access the Full Project by Clicking here!
Bidjugde
JOB
Ellis Creek Headworks Screen Replacement
BID DATE
01/14/15 - 3:30
AGENCY
Petaluma
ESTIMATE
$1,630,000
SCOPE
The WORK includes: but is not limited to: remove existing mechanical screens, washers/compactors, associated piping, supports, electrical equipment and controls, and appurtenances; drain and clean the screen channels; inspect, and install the City~f rnished mechanical screening equipment; furnish and install associated ancillary equipment and appurtenances including but being not limited to piping, pipe suppmis, electrical equipment and control, conduit and training; modify the existing structure and guardrails; investigate existing electrical installations including conduits and their locations; coordinate with requirements for new installation; modify the existing electrical power distribution system; provide test procedures, execute testing, and fUrnish test results for the complete interconnected system including receiving requirements from the City and the Citys Programmer, and integrating with test requirements for the equipment and systems furnished and installed (The tests shall include, but are not limited to, mechanical startup and testing, operational readiness tests for electrical and controls, and functional acceptance testing on the system); perform all work necessary to complete the WORK as indicated in the Contract Document.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT