Access the Full Project by Clicking here!
Bidjugde
JOB
Middle Crossing North Reservoir Erosion Repairs
BID DATE
10/26/23 - 11:00
AGENCY
San Jacinto River Authority
ESTIMATE
n/a
SCOPE
The Middle Crossing and North Reservoir are located in east Harris County near the SJRA’s Highlands Division Office and are a part of the canal system that SJRA’s Highlands Division maintains and utilizes to deliver raw water to its customers. These two locations have significant erosion issues that are an operational reliability and safety concern and need to be addressed. The erosion repairs that will be made at the Middle Crossing and North Reservoir include but are not necessarily limited to levee regrading, riprap installation, and replacement of the existing culvert pipes including concrete end structures and water control gates at both locations to allow division staff to safely operate the canal structures. ggarrow@sjra.net https://brazosbid.ionwave.net/VendorResponse/Bid/VResponseEvent.aspx?EventID=mUgXAs.iP7A_
PREBID
9/11/2023 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT