Access the Full Project by Clicking here!
Bidjugde
JOB
FY2024 Cave Creek Paving
BID DATE
10/19/23 - 10:00
AGENCY
Cave Creek
ESTIMATE
n/a
SCOPE
The edge mill and overlay projects will consist of a complete mill of the outer two-foot edge of the existing roadways in accordance with MAG Standard 317. Immediately following the edge milling a thickened edge will be required in accordance with MAG Standard 321.8.8 prior to placing new asphalt. All placement of new asphalt must be installed in accordance with MAG Standard 321. The pavement installation would consist of¾ -inch asphalt in accordance with MAG Standard Specification 710. The combined areas to be completely milled and paved consist of portions of 48th St, N. Canyon Ridge Trail, Hidden Valley Dr, Skyline Drive, and 50th St. These areas of construction total approximately 121,500 square feet (13,S00SY). The combined areas to be edge milled and overlayed consist of portions of Highland Rd, and Rancho Manana Blvd. These areas of construction total approximately 57,980 square feet (6,442SY). The total combined area of these projects totals approximately 179,480 square feet (19,942SY). The projects consist of 5 roads requiring a complete mill and 2 ½ -inch thick pavement installation as well as 2 roads requiring an edge mill and 2 ½ -inch overlay. TThurman@CaveCreekAZ.gov https://www.cavecreekaz.gov/bids.aspx?bidID=16

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT