Access the Full Project by Clicking here!
Bidjugde
JOB
Reed Park Improvements
BID DATE
10/13/23 - 3:30
AGENCY
Fruita
ESTIMATE
n/a
SCOPE
This project consists of the removal and modification of existing concrete, asphalt and park facilities and the installation of new recreation & pedestrian improvements, utilities and pavement, a skate/wheel park and shelter/restroom facilities. Work includes, but is not limited to, installation and maintenance of traffic control and storm drain inlet protection, removal of existing asphalt, concrete, underground utilities, an existing restroom structure and existing landscaping and trees; procurement and installation of concrete drain pan, curb, gutter and sidewalk, concrete pavement, asphalt pavement, sewer, water, irrigation and drainage utilities, a stormwater pump system, rest room and shelter foundations and structures, playground facilities, wheel/skate park concrete and features, including related excavation, and trees/landscaping as shown on construction plans. Chris Dehmel 970-858-8377 cdehmel@fruita.org Sam Atkins 970-858-8377 satkins@fruita.org https://www.bidnetdirect.com/colorado/solicitations/open-bids/Reed-Park-Improvements-Project/0000330471?purchasingGroupId=8409951&origin=2
PREBID
10/6/2023 3:30

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT