Access the Full Project by Clicking here!
Bidjugde
JOB
ATP Cycle 5 Cathedral Canyon Drive Sidewalks Multiuse Trail Date Palm Drive Expansion
BID DATE
10/19/23 - 2:00
AGENCY
Cathedral City
ESTIMATE
n/a
SCOPE
The work to be done includes mobilization, traffic control, stormwater BMPs, construction staking and perpetuation; grading; clearing and grubbing; removal of utilities, trees, AC pavement, PCC, base, subgrade, native material, and unclassified material; construction of AC pavement over compacted CAB; construction of full depth AC; construction of PCC sidewalk, curb ramp, curb and gutter, cross gutter and spandrel, and retaining curb; construction of slough wall; construction of decomposed granite over compacted native material; adjustment to grade and/or relocation of utilities; construction of cabinet foundation and extension of existing conduit and wiring for relocated utility; coordination for relocation of utilities by others; signing and striping; and furnishing and installation of speed feedback sign and hybrid beacon per project documents. Work shall be performed, placed, constructed, or installed within public streets right-of-way. https://www.cathedralcity.gov/Home/Components/RFP/RFP/179/1729

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT