Collett Sublett Road Infrastructure Improvements
BID DATE
10/12/23 - 2:00
AGENCY
Kennedale
ESTIMATE
$3,600,000
SCOPE
UNITS 1 Water Improvements: 112 LF Remove & Dispose Exist 6" AC Waterline 4 EA Install New Fire Hydrant and Assembly 1365 EA 12" PVC Waterline 4 EA Install 12" Gate Valve & Box 18 EA Install New Meter Box 18 EA Connect 1" Copper Water Service 1 LS Temporary Water Service 70 LF Temporary Asphalt Pavement Repair UNITS II Sewer Improvements: 1312 LF Install 8" PVC Sanitary Sewer Pipe by Open Cut 4 EA Install 4' Manhole with Concrete Collar 16 EA Reconnect 4" Services w/ 2 Way Cleanout 1312 LF Temporary Asphalt Repair UNITS III Paving Improvements: 1222 CY Unclassified Excavation 5554 SF Remove and Dispose Concrete Driveway 2898 SF Remove and Dispose Gravel Driveway 3425 SY Remove and Dispose Asphalt Pavement 2 EA Remove and Replace Brick Column 6530 SF 6" Concrete Driveway 991 SF Install Gravel Driveway 13367 SF 4" Concrete Sidewalk 215 SY 6" Type "B" HMAC Base Course 215 SY 2" Type "D HMAC Surface Course 4768 SY 6" Concrete Pavement 3120 LF 6" Concrete Curb 744 CALIPER INCH Tree Removal UNITS IV Drainage Improvements: 105 CY Channel Excavation 5 EA 10' Curb Inlet 1 EA 15' Double Sided Curb Inlet 1 EA 4'x4' Drop Inlet 2 EA 4' Storm Junction Box 92 LF 18" Class III RCP 359 LF 24" Class III RCP 1 EA 24" Winged Headwall 190 SY 4" Concrete RipRap 350 SY 4" Concrete Flume 256 LF Temporary Asphalt Repair https://www.civcastusa.com/project/6500a7ad28b407f0f9018696/summary colton.sizemore@shield-engineering.com
PREBID
9/26/2023 11:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT