Pechanga Permanent Capacity Improvements
BID DATE
10/11/23 - 2:00
AGENCY
Rancho California WD
ESTIMATE
$875,000
SCOPE
Construction of approximately 205 linear feet (LF) of 20-inch AWWA cement mortar-lined and coated (CML&C) steel water pipeline and approximately 108 LF of 16-inch AWWA CML&C steel water pipeline, as well as a new above-grade flow meter connected to an existing backflow assembly and a new above-grade flow meter and backflow assembly, including all miscellaneous piping, connections, couplings, valves, appurtenances, and site improvements. https://pbsystem.planetbids.com/portal/39498/bo/bo-detail/109605