Access the Full Project by Clicking here!
Bidjugde
JOB
Todos Santos Plaza Archway
BID DATE
02/13/15 - 12:00
AGENCY
Concord
ESTIMATE
n/a
SCOPE
The work to be done in general consists of fabrication and installation of two tubular steel archways and construction of supporting concrete columns and cast in drilled hole (CIDH) pier foundations, furnishing and installing cultured stone veneer on column faces, furnishing and installing bronze plaques, coordinating the work of sign fabricator (letters and LED lighting on backing plates, fabricated by others) assembly of signage in archway and providing electrical connection to existing service and all other work as shown on the Plans and as specified in these Special Provisions. Contractors interested in submitting a bid shall attend either one of the mandatory Pre-bid meetings at the Engineering Services Conference Room, located at 1435 Gasoline Alley, City of Concord, California. Said meetings will be held on Wednesday, February 4, 2015 at 1:30 p.m. and Friday, February 6, 2015 at 11:00 a.m. This is a pre-requisite in submittal of a bid. Bidders should become familiar with the terms and conditions of the Contract Documents prior to attending this meeting. The Contractor shall possess a valid Class "A" or Class “B” General Contractor License at the time the bids are opened. Scott Christie (925) 671-3031 scott.christie@cityofconcord.org
PREBID
2/6/2015 11:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT