JOB
Heritage Park Farm Splash Pad & Improvement
BID DATE
02/10/15 - 4:00
AGENCY
Marana
ESTIMATE
n/a
SCOPE
BID DATE CHANGED. The project consists of constructing a restroom and water/sewer improvements at the Marana Heritage Farm. The restroom will be a site built, CMU structure, built in accordance with the Town of Marana Adopted Code standards as listed below. It is the responsibility of the Contractor to retain a geo-technical engineering firm to provide quality control tests. The Town requires that any and all materials used on the project pass all tests in accordance with the specifications. Certificates of Compliance and Certificates of Analysis shall be presented to the Construction Manager/Construction Inspector for each material/load delivered to the project. The Contractor shall provide construction survey and layout as required to complete the said project.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT