Calle Concordi Bike Lanes
BID DATE
04/5/11 - 3:00
AGENCY
Town of Oro Valley
ESTIMATE
$250,000
SCOPE
The work to be performed includes, but is not limited to: add 5’ asphalt shoulder to both sides of Calle Concordia from the intersection at Loma Linda to the intersection at Buena Vista per plan by saw-cutting existing asphalt edge, excavate existing shoulder, scarify and re-grade and compact the roadway base, place 6” of aggregate base course, place 2” of new Mix #2 asphalt shoulder with Maricopa edge, then overlay entire roadway with 2” of Mix #2 asphalt, adjust existing water valve boxes. The project includes constructing drainage improvements, relocation of mesquite trees by spading and relocate cactus, placement of Handplaced and Grouted rip rap, concrete header, application of pavement markings and markers, placement of signs and other incidental items of work, on Calle Concordia Boulevard in Oro Valley, Arizona.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT