Access the Full Project by Clicking here!
Bidjugde
JOB
Alley Reconstruction AD 111 Area UUD 22 Phase 2 AD 124 Phase 0
BID DATE
10/3/23 - 10:00
AGENCY
Newport Beach
ESTIMATE
$2,600,000
SCOPE
The work necessary for the completion of this contract consists of, but is not limited to, (1) distributing notices to affected residents; (2) traffic control; (3) construction surveying; (4) removing existing asphalt or concrete streets/alleys, alley approaches, sidewalks, curb and gutter, concrete valley gutters and driveways; (5) constructing new concrete streets/alleys, alley approaches, sidewalks, curb and gutter and driveways; (6) adjusting and/or installing new City utility covers to grade; (7) replacing obliterated or damaged traffic striping; (8) coordinating with subcontractors to adjust utility facilities to grade; (9) removing existing hardscaping and pavement as needed for contract work; and (10) other incidental items to be completed in work places required by the Contract Documents. All construction for the work shall reference these Special Provisions, the Standard Specifications, and all Contract related documents. https://pbsystem.planetbids.com/portal/22078/bo/bo-detail/109497 Patrick Arciniega 949-644-3347 parciniega@newportbeachca.gov
PREBID
9/20/2023 10:30

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT