Access the Full Project by Clicking here!
Bidjugde
JOB
CentrePort Trail Phase 1
BID DATE
09/28/23 - 1:30
AGENCY
Fort Worth
ESTIMATE
n/a
SCOPE
The major work will consist of the (approximate) following: Construct a twelve (12) foot wide trail with two (02) foot wide shoulders from the intersection of Trinity Boulevard/Skyview Drive to the TRE CentrePort Rail Station. Project to includes approximately 10,500 SY of 5” sidewalk pavement, 3,125 CY of embankment, 6,045 CY of excavation, seven (07) cast-in-place retaining walls totaling 5,873 SF of wall face, and two (02) drill shaft retaining walls requiring approximately 4,530 LF of drill shaft (36”-48” diameter) and totaling 3,697 SF of wall facia, 718 LF of cast-in-place 54-inch tall Single Slope concrete traffic barrier, and one (01) 100-foot span pedestrian bridge including drill shafts and substructure. Project will also include removals, small drainage structures, signage, striping and erosion control. david.munoz@fortworthtexas.gov https://www.fortworthtexas.gov/departments/finance/bids/manual-bids/pacsd/2023/centreport-trail-phase-1

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT