2023 Midlothian Utility Package
BID DATE
09/12/23 - 9:00
AGENCY
Midlothian
ESTIMATE
n/a
SCOPE
This project’s base bid involves constructing water and sanitary sewer lines at six (6) different project sites and three (3) Additive Alt. Bids. project sites: 9th Street and Alabama, Mockingbird Ln, Ave H and Railway Ave, 8th Street Alley, 5th Street Alley, 13th Street Alley, 9th Street And Cemetery Ln (Additive Alt. Bid), W. Main Street and 6th Street Alley (Additive Alt. Bid), and 5th Street and Meadowcrest (Additive Alt. Bid). Between the nine sites, approximately 2035 linear feet total of 8-inch water line, 40 linear feet total of 6-inch water line, 525 linear feet of 16-inch water line, 2525 linear feet of 8-inch sanitary sewer line, and 2625 linear feet of 6-inch sanitary sewer may be installed. https://www.midlothian.tx.us/Bids.aspx?BidID=172 or https://www.civcastusa.com/project/64ece4c8404ba7cc8a438327/summary