Access the Full Project by Clicking here!
Bidjugde
JOB
Wastewater Collection System Rehabilitation 2023
BID DATE
09/19/23 - 9:00 LIVE!
AGENCY
Tempe
ESTIMATE
$3,336,278
SCOPE
REHABILITATION OF PIPE SEGMENTS CONSIST OF INSTALLING CIPP LINER INTO THE PIPE INTERIOR, INSTALLING UV CURED PIPE PATCHES, OR REMOVING AND REPLACING SANITARY SEWER PIPE IN-KIND. TO COMPLETE CIPP LINER INSTALLATION, SEWER FLOW MAY NEED TO BE DIVERTED AROUND THE WORK AREA THROUGH BYPASS OPERATIONS AT SOME LOCATIONS. REHABILITATION OF MANHOLES CONSIST OF REPAIRING PVC T-LOCK LINER, APPLYING EPOXY COATING TO THE MANHOLE INTERIOR INCLUDING THE BENCH, WALL, CONE AND CHIMNEY, INSTALLING CORROSION RESISTANT STRUCTURAL MANHOLE INSERTS, AND REMOVING AND REPLACING FRAME AND COVER, CHIMNEY, AND CONE engineering_bids@tempe.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT