Access the Full Project by Clicking here!
Bidjugde
JOB
Dog Park Improvements Phase II
BID DATE
09/13/23 - 11:00
AGENCY
Victoria
ESTIMATE
$85,200
SCOPE
The selected respondent contractor shall furnish and install the following improvements for the DOG PARK IMPROVEMENTS PHASE II: • Water utility improvements, as detailed and specified on Sheet C4.1 “Victoria Dog Park Water Utility”. Improvements include the purchase and install of approximately 1,360 LF of 2” PVC SCH80 water main, hose bibs and pipe casing as noted. All items shall be complete in place as shown on plan; • Solar light improvements, as detailed and specified on Sheet E201 “Electrical Site Plan”. Improvements include the purchase and installation of nine solar lights on a concrete pole base; • Pet fountain improvements, as detailed and specified on Sheet L2.1 “Materials Site Plan”. Improvements include the purchase and installation of a pet drinking fountain; the saw cut and removal of concrete as noted; providing water line connection to the pet drinking fountain from an existing 2-inch water line and providing a 4 inch perforated drain pipe connection from the pet drinking fountain in a gravel bed; and the replacement of concrete as noted. • All other appurtenances necessary to complete the Project. Thomas Anklam 361-485-3170 tanklam@victoriatx.gov https://www.bidnetdirect.com/texas/solicitations/open-bids/DOG-PARK-IMPROVEMENTS-PHASE-II/0000328860?purchasingGroupId=8407551&origin=2

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT