St Albans Storm Drain Rehabilitation
BID DATE
08/29/23 - 3:00
AGENCY
San Gabriel
ESTIMATE
n/a
SCOPE
The work to be done consists of furnishing all materials, equipment, tools, labor, transportation, and incidentals as required by the Plans and Specifications, and contract documents. The general items of work include the replacement of broken 30-inch corrugated steel storm drain pipe with a new 30-inch x 295 feet long dual wall corrugated high density polyethylene (HDPE) pipe on St. Albans Road, which shall include the excavation, removal of existing pipe, cement slurry backfill, installation of new precast manhole, and repair of existing A.C. street pavement and curb & gutter after the required installation work is completed. amai@sgch.org