Access the Full Project by Clicking here!
Bidjugde
JOB
Coronado Lane Avenida Victoria Storm Drain Improvements
BID DATE
09/12/23 - 2:00
AGENCY
San Clemente
ESTIMATE
$70,000
SCOPE
The work to be performed, in general, consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Plans, Specifications, and contract documents for the installation of approximately 30 linear feet of 12” P.V.C. storm drain pipe and the construction of one (1) storm drain catch basin at Coronado Lane intersection with Avenida Victoria, in the City of San Clemente, CA. The general method of the storm drain construction work includes limited removal and replacement of existing A.C. pavement and Portland cement concrete curb and gutters, erosion control BMP’s, and construction of a new concrete junction structure. The work also includes pedestrian and traffic control and diversion of ground and surface flowing water. https://pbsystem.planetbids.com/portal/28939/bo/bo-detail/109063 Rachel Perez 949-361-6119 perezr@san-clemente.org
PREBID
8/29/2023 9:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT