Access the Full Project by Clicking here!
Bidjugde
JOB
Adams Avenue Improvements
BID DATE
12/23/14 - 2:00
AGENCY
El Centro
ESTIMATE
n/a
SCOPE
This project involves cold milling the existing street section to a depth of two (2) inches, adding a two and one half (2.5) inch asphalt leveling course, an engineered paving mat, and one and one-half (1.5) inch ARHM at a two thousand three hundred (2,300) foot portion of Adams Avenue between the Lotus Drain at the west city limit and La Brucherie Avenue in the City of El Centro, CA, and construction of Portland Cement Concrete (PCC) curb, gutter, sidewalk, along with the relocation and/or adjustment of existing water valves, sewer manholes and all appurtenant work as detailed in the plans and specifications. The completed portion of Adams Avenue will be restriped and signed per plan.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT