JOB
Storm Drain Line 20 Stage 3
BID DATE
09/19/23 - 3:00
AGENCY
Palm Springs
ESTIMATE
$7,000,000
SCOPE
The work comprises the construction of major storm drain and flood control improvements, consisting of various size reinforced concrete structures ranging in size from 24” to 96” reinforced concrete pipe (RCP), 10’Wx7’H, 10’Wx5’H, and 8’Wx6”H precast reinforced concrete boxes, manhole structures, junction structures, transition structures and catch basins; removal and replacement of exiting asphalt concrete pavement, crushed miscellaneous base, traffic striping and markings; and all appurtenant work. The work is identified as Palm Springs Storm Drain Line 20, Stage 3, located in Farrell Road, Baristo Road, Ramon Road and Compadre Road. https://pbsystem.planetbids.com/portal/47688/bo/bo-detail/108216 Andrew Crider 760-323-8253 x8738 Andrew.Crider@palmspringsca.gov