Access the Full Project by Clicking here!
Bidjugde
JOB
Flora Phase 1a Sections 3 4
BID DATE
09/25/23 - 3:30
AGENCY
Wylie
ESTIMATE
n/a
SCOPE
RCP Drainage Piping, Including Approximately 18”- 48” Pipe, 6’x3’ RCB, Inlets, Headwalls and Appurtenances; Water Piping, Including 8” PVC Pipe, 4” – 6” Irrigation Sleeves, Valves, and Appurtenances; Gravity Wastewater Piping consisting of 8” PVC Pipe, Steel Encasement, Manholes, and Appurtenances; Excavation, Embankment and Paving; Detention Pond, Outfall Structures, Grading & Revegetation; Sedimentation & Erosion Control; and Various Other Site Improvements. https://www.civcastusa.com/project/64dbfb06862540bc62efbe82/summary ileal@bgeinc.com
UPDATES