Access the Full Project by Clicking here!
Bidjugde
JOB
Dragonfly Channel Phase 1 2B 3A
BID DATE
09/27/23 - 2:00
AGENCY
Dona Ana County
ESTIMATE
n/a
SCOPE
Project Phase 1 consists of improvements to the Holman Road Crossing, channel construction, energy dissipation features relocation and lowering of utilities & installation of fencing. Holman Road Crossing will consist of (5) 10’x10’ double opening box culverts & wingwalls underneath Holman Road. Channel construction will include 28,550 CY of earthwork to be excavated and stored within the designated deposition area, with top soil stripped and stockpiled to cap deposition area at the end of earthwork activity. Energy dissipation features will include 292 CY of soil cement and 170 CY of wire enclosed rip rap to construct a soil cement pad on upstream side of box culverts and riprap dissipation on the downstream side. Utility work includes relocation of 466 LF of force main, installation of 4 new sewer manholes, and lowering of 520 LF of ductile iron waterline. Fencing improvements will include removal of 310 LF of existing fencing and installation of 1,816 LF of new 4 strand wire fencing. https://www.donaanacounty.org/Home/Components/RFP/RFP/120/121 brice.ortiz@soudermiller.com

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT