Denison Raw Water Piping Denison Dam Powerhouse
BID DATE
08/28/23 - 2:00
AGENCY
Department Defense
ESTIMATE
n/a
SCOPE
The purpose of this project is to remove and replace existing cooling water piping, fittings, valves, and other associated materials on turbines 1 & 2 and replace with FBE: fusion bonded epoxy coated pipe and fittings for the Denison DAM Powerhouse located in Dension, TX. Pipe and fittings will be coated inside and outside with FBE. FBE formulation and application shall be in accordance with AWWA C213-22. Limits of work begin at the raw water strainer outlet connection and continue through the generator air coolers to the draft tube connection. https://sam.gov/opp/e4dcfc69ee1047a7a298f557684b2a2a/view ronica.r.smith@usace.army.mil