Access the Full Project by Clicking here!
Bidjugde
JOB
2023 Concrete Paving Maintenance
BID DATE
08/21/23 - 2:00
AGENCY
Angleton
ESTIMATE
$250,000
SCOPE
The project generally consists of two main portions, the intersection between N. Downing St and S Belle Dr and the intersection between Dumars Dr. and Noreda St. From these two projects includes removing existing pavement and replacing with approximately 1070 L.F. of proposed 7” concrete pavement, removing and replacing approximately 110 S.Y. of proposed 6” thick concrete driveway and removing and replacing 240 S.F. of proposed 4” concrete sidewalk. For N. Downing St and S Belle Dr portion, the project also includes replacing 20 L.F. of both a 30” and 42” reinforced concrete pipe, approximately 10 L.F. of an 8” SDR 35 drainage pipe and connection to inlet, and the rehabilitation of an existing storm sewer with 1” Cementitious material, as well as removing and replacing 2 proposed sidewalks. https://www.civcastusa.com/project/64d1067a167edcb1f0726ef6/summary

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT