Access the Full Project by Clicking here!
Bidjugde
JOB
Luther Street Rehabilitation Penberthy Blvd Marion Pugh Dr
BID DATE
09/1/23 - 2:00
AGENCY
College Station
ESTIMATE
$2,000,000
SCOPE
The project involves the construction of approximately 1,500 linear feet of improvements of Luther Street from Marion Pugh Boulevard to Penberthy Boulevard. These improvements will consist of removal and replacement of the existing roadway pavement, addition of sidewalk, installation of a storm drain system, replacement of the existing 16-inch DIP water main from Penberthy Boulevard to Sienna Drive. The proposed storm drain system will connect to the existing storm drain system approximately 700’ to the south of Luther Street in Marion Pugh Boulevard. All proposals shall follow the format provided by the City of College Station. The City is seeking a construction company with quality experience in road and utility reconstruction. https://brazosbid.ionwave.net/VendorResponse/Bid/VResponseEvent.aspx?EventID=E-g5NpKY1eE_
PREBID
8/18/2023 2:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT