Woodland Ave Waterline Interconnect
BID DATE
09/26/23 - 2:00
AGENCY
East Palo Alto
ESTIMATE
n/a
SCOPE
Consisting of abandoning and removing 8-inch cast iron pipe (CIP) water main, installing 12-inch polyvinyl chloride (PVC) pipe water main, 8-inch PVC, and 6-inch PVC, installing a valve pit, site preparation, concrete work, traffic control and so on according to plans and specifications prepared by the City of East Palo Altocwong@cityofepa.org https://www.cityofepa.org/rfps