Access the Full Project by Clicking here!
Bidjugde
JOB
Snow College Richfield Campus Paving Improvements
BID DATE
08/24/23 - 3:00
AGENCY
DFCM
ESTIMATE
$157,500
SCOPE
Project Description: The road to the south of the college is in bad condition and will need to be removed and replaced. Also, on the north end of the campus a 3-way stop is needed that includes an island to help regulate traffic in that area. Mobilization. Traffic Control. Subsurface Investigation. Bituminous Surfacing 3". Bituminous Surfacing 4". Untreated Basecourse. Subgrade Granular Fill. Removal of Bituminous Surface. Remove Curb & Gutter. Remove Concrete Pedestrian Ramp. Pavement Sawing. Pavement Marking Paint. ADA Pedestrian Access Ramp. Concrete Curb and Gutter.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT