Access the Full Project by Clicking here!
Bidjugde
JOB
Water Main Sewer Replacement
BID DATE
08/31/23 - 11:00
AGENCY
Turlock
ESTIMATE
$5,883,172
SCOPE
The work consists, in general of: Installing approximately 9,200 LF of 8-inch C900 water mains, water service laterals, approximately 700 LF of 8-inch C900 sewer mains, sanitary sewer services, 48-inch diameter manholes, drainage inlet catch basins with complete bubble up system, trench patching, curb return pedestrian ramps, road resurfacing and furnishing all necessary labor, materials, tools, equipment and incidentals needed to perform the improvements as shown on the contract plans complete and in place. This work shall be completed in accordance with the current City Standard Specifications, Drawings, Errata 1 and these Special Provisions. engineering@turlock.ca.us jlee@turlock.ca.us

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT