Access the Full Project by Clicking here!
Bidjugde
JOB
Combs Road Kenworthy Road Improvements
BID DATE
09/22/23 - 2:00 LIVE!
AGENCY
Pinal County
ESTIMATE
$20,807,847
SCOPE
Combs Road - proposed work is located on the Combs Road alignment between Pecan Creek Drive and Black Forest Road, totaling approximately 8,750 linear feet and along the Schnepf Road alignment between Stagecoach Pass Avenue and Sherry Lane, totaling approximately 6,525 linear feet. The work includes constructing the Combs Road roadway to provide up to three westbound travel lanes and two eastbound travel lanes. Raised medians will be constructed for most of Combs Road, providing breaks for turn lanes and intersections. Left and right turn lanes will be provided at access points required for adjacent properties and at intersections with crossing streets. Traffic signals will be installed at three intersections within the project limits. Kenworthy Road - proposed work is located on the Kenworthy Road alignment between ½ mile north of Combs Road and Chandler Heights Road, totally approximately 3,300 linear feet. The work includes constructing a new three-lane roadway with drainage improvements to provide one travel lane in each direct, a continuous two-way left turn lane, and sidewalk. Regional drainage improvements include a combination five cell, ten-foot by six-foot/single cell ten-foot by twelve-foot reinforced concrete box culvert to provide an all-weather crossing (100 year storm event) of Queen Creek Wash. https://pinalcountyaz.bonfirehub.com/opportunities/99648 LIVE: https://meet.google.com/AGB-DQBR-XSN Lorina.Gillette@pinal.gov
UPDATES