Access the Full Project by Clicking here!
Bidjugde
JOB
Austin Parkway Chimneystone Drainage Improvements
BID DATE
09/14/23 - 9:00
AGENCY
Sugar Land
ESTIMATE
$14,200,000
SCOPE
Construction of a storm sewer trunkline (and associated appurtenances) between Ditch A and the Acacia Drive storm sewer outfall. This segment of storm sewer will consist of 10-foot-wide by 6-foot-tall reinforced concrete box (RCB) piping. This new piping will be installed parallel to the existing RCB storm sewer system that outfalls to Ditch A and will be hydraulically connected. Construction of storm sewer improvements (and associated appurtenances) along Acacia Drive. The storm sewer improvements will consist of reinforced concrete pipe (RCP), varying in size from 24-inch diameter to 54-inch diameter. This new piping will be installed in parallel to the existing storm sewer system along Acacia Drive and be hydraulically connected. Construction of a storm sewer trunkline (and associated appurtenances) between the Acacia Drive storm sewer outfall and Austin Parkway. This segment of the storm sewer trunkline will consist of 8-foot-wide by 6-foot-tall RCB piping; and Construction of a stormwater drainage channel (and associated appurtenances) between Austin Parkway and Thistlewood Drive, within the City’s undeveloped Oilfield Road ROW. This work will also include the construction of lateral outfalls to afford a hydraulic connection between the channel and the storm sewer systems within the neighborhoods immediately to the west. Jason Poscovsky (281) 275-2302 jposcovsky@sugarlandtx.gov https://www.civcastusa.com/project/64c969be020b629e944b033c/summary
PREBID
8/24/2023 9:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT