Oak Avenue Crystal Springs Road Intersection Improvements (REBID)
BID DATE
09/26/23 - 2:00
AGENCY
San Bruno
ESTIMATE
n/a
SCOPE
Interstate Grading & Paving - $734,800 The project involves intersection improvements at the intersection of Oak Avenue/Crystal Park Way and Crystal Springs Road. Work includes, but is not limited to: 1. Reconstruction of curb ramps at the northwest and southwest corners; and construction of new curb extensions and sidewalk at the northeast and southeast corners of the intersection; 2. Drainage improvements; 3. Restriping of all approaches to the intersection to (Crystal Springs Road) to add left-turn pockets, and high visibility yellow crosswalks; 4. Installation of a new traffic signal, including coordinating and accommodating PG&E schedule for power connection; 5. Advance procurement of traffic signal poles and foundation elements; 6. Pothole traffic signal pole foundation locations; 7. Secure necessary permitting per Section 01 41 00 (Regulatory Requirements); 8. Temporary traffic control per Section 01 51 00 (Temporary Facilities and Control); 9. Site cleaning and removal of debris, equipment, and excess material from the sites upon completion of work; 10. Other work as shown on Drawings and as listed and described in the bid items and scope of work; 11. Coordination with the ongoing RAC construction Brian Liu bliu@sanbruno.ca.gov https://www.sanbruno.ca.gov/bids.aspx?bidID=35 or https://www.barkerblueplanroom.com/jobs/255/details/oak-avenue-and-crystal-springs-road-intersection-improvements
UPDATES