Access the Full Project by Clicking here!
Bidjugde
JOB
Carriage Hills Detention Pond Outlet Structure
BID DATE
09/14/23 - 2:00
AGENCY
Bryan
ESTIMATE
$230,000
SCOPE
The City anticipates the scope of work for the Project to consist of the following responsibilities and the following items: • Detention Pond Outfall Structure • 42” HDPE Storm Sewer • Concrete Storm Structure • Concrete Sidewalk • Concrete Slope Paving • Traffic Control • Stromwater Pollution Prevention and Erosion Control Prevention Devices lperez@bryantx.gov https://brazosbid.ionwave.net/VendorResponse/Bid/VResponseEvent.aspx?EventID=Pw58Xys-dyc_

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT