Access the Full Project by Clicking here!
Bidjugde
JOB
Enterprise 6 inch Recycled Water Pipeline Abandonment
BID DATE
09/6/23 - 2:00
AGENCY
Irvine Ranch WD
ESTIMATE
$165,000
SCOPE
The Project includes, but is not limited to, the removal of three existing 6-inch valves, filling of a 6-inch ACP recycled water pipeline with 1-sack slurry and abandonment in place, demolition and removal of existing irrigation service including temporary irrigation line and POC, construction of a new 2-inch service and meter on Alton Pkwy and connection to existing POC, replacement of curb, gutter, and sidewalk as necessary, and utility trench repair. https://pbsystem.planetbids.com/portal/39499/bo/bo-detail/108334 Brianna Palecek 949-453-5811 palecek@irwd.com

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT