Access the Full Project by Clicking here!
Bidjugde
JOB
Water Transmission Main Renewal Phase 1 Foothill
BID DATE
08/30/23 - 3:00
AGENCY
Santa Barbara
ESTIMATE
$1,000,000
SCOPE
Evaluate the existing 24" transmission main from the intersection of Garden St and Mission St, where the new Desal Conveyance Line will connect, to the Cater Water Treatment Plant and identify transmission main rehabilitation methods to best convey desalinated water to the Cater WTP. The project will also need to develop a mixing system to blend the desalinated water with the Cater WTP flow to prevent reverse flow. https://pbsystem.planetbids.com/portal/29959/bo/bo-detail/107556 Mehdi Moussavian 805-897-2501 MMoussavian@SantaBarbaraCA.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT