Access the Full Project by Clicking here!
Bidjugde
JOB
High Pointe Ranch Phase 1a Utilities
BID DATE
08/10/23 - 10:00
AGENCY
Lennar Homes
ESTIMATE
n/a
SCOPE
Furnish all labor, materials, equipment and incidentals necessary to perform all installation, maintenance, removal and area cleanup related to sedimentation control work as shown on the Drawings and as specified herein. The work shall include, but not necessarily be limited to; installation of temporary access ways and staging areas, silt fences, sediment protection at storm drain inlets, sediment removal and disposal, device maintenance, removal or temporary devices, temporary mulching, erosion control blankets and final cleanup. https://www.civcastusa.com/project/64b9fa305fc5395e8edb9921/summary kyle.brockman@kimley-horn.com
PREBID
8/1/2023 2:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT