Access the Full Project by Clicking here!
Bidjugde
JOB
Behner WTP Access Road Slope Repair - Phase I
BID DATE
02/13/15 - 11:00
AGENCY
Pasadena
ESTIMATE
n/a
SCOPE
These Specifications are for the furnishing of all supervision, labor, equipment, and materials necessary to perform the Behner WTP Access Road Slope Repair for the City of Pasadena, as required by the Water Division of the Water and Power Department. The work shall include construction of approximately 120 lineal feet of 12-inch diameter ductile iron water main and appurtenances, hot tap connection to an existing 16-inch ductile iron water main, slope repair including geogrid and reinforced fill placement, surface restoration, erosion control, paving, and other miscellaneous site work all in accordance with the contract documents. All quantities above are approximate and the Work is fully described in the contract documents. Sandra Andrade-Hernandez - 626-744-4189 sandrade-hernandez@cityofpasadena.net
PREBID
1/22/2015 2:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT