Access the Full Project by Clicking here!
Bidjugde
JOB
Lyon Avenue Sidewalk Phase 1 Tahquitz Sewer Mainline Replacement
BID DATE
08/21/23 - 2:00
AGENCY
San Jacinto
ESTIMATE
$450,000
SCOPE
The project’s general work occurs in two physically separated locations. Tahquitz Mainline Sewer Replacement consists of the removal and reconstruction of the existing sewer system in Tahquitz Street and adjacent alley Lyon Avenue Sidewalk (Phase 1) consists of the construction of curb ramp, sidewalk and local drainage along Lyon Avenue near Appaloosa Drive. As part of the work the Contractor shall furnish all labor, technical and professional services, supervision, materials, equipment, tools, and incidentals as required by the Plans, Specifications, and Contract Documents. https://pbsystem.planetbids.com/portal/39490/bo/bo-detail/107853 Stuart McKibbin smckibbin@interwestgrp.com

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT