Access the Full Project by Clicking here!
Bidjugde
JOB
Syphon Reservoir Improvements Project Portola Parkway Sand Canyon Avenue Intersection Access Road I
BID DATE
08/28/23 - 2:00
AGENCY
Irvine Ranch WD
ESTIMATE
$2,610,000
SCOPE
The project consists of work located both on IRWD property (outside the City of Irvine right-of-way) and work located within the City right-of-way. The proposed improvements include adding a new fourth leg to the existing three-legged Portola Parkway and Sand Canyon Avenue intersection. The fourth leg will provide a new entrance to IRWD’s Syphon Reservoir site. The existing median on Portola Parkway will be modified to add a left turn lane for eastbound traffic into the reservoir site. Signing, striping, and traffic signals at this intersection will be modified and two existing streetlights located in the median will be relocated within the modified median. The on-site drainage components will be modified to tie-in to the existing storm drain system in Portola Parkway. The work shall generally include, but not be limited to, existing site feature demolition, earthwork, precise grading, site improvements, asphalt concrete paving, concrete, soil nail walls, signing and striping, traffic signals, drainage, fencing, Best Management Practices (BMP), erosion control, landscaping, irrigation, temporary utilities, and site security. https://pbsystem.planetbids.com/portal/39499/bo/bo-detail/107810 Nang Mwe 949-453-5331 mwe@irwd.com
UPDATES