Access the Full Project by Clicking here!
Bidjugde
JOB
Waterline Replacement Clearview Drive
BID DATE
07/31/23 - 1:00
AGENCY
Palestine
ESTIMATE
n/a
SCOPE
This is a request for proposal for Waterline Replacement on Clearview Drive. • Replace the old six-inch cast iron water main with 1,300 feet of six-inch c900. • Install twenty-five (25) one-inch services, then reduce at meter to three fourths-inch • Install one (1) one-inch service with 1-inch meter • Install one (1) two-inch service, then reduce to 1 ½-inch meter • Install two (2) fire hydrants with valves at the main • Kill out old mains • Install two (2) wet taps six-inch x six-inch cast iron • Install five (5) valves • Relocate one (1) meter out of driveway • All services and pipes will need tracer wire • Must take Bac-t Samples, and they must all be negative before tying in the water line • Must notify all residents of work to be done • If bidding on the project, the contractor must visit the site prior to bidding pwadmin@palestine-tx.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT