Access the Full Project by Clicking here!
Bidjugde
JOB
2023 Annual Storm Drain Improvement Drake Ct Brittan Ave El Camino Real
BID DATE
07/18/23 - 2:00
AGENCY
San Carlos
ESTIMATE
$2,500,000
SCOPE
The scope of work generally includes mobilization, traffic control, water pollution control, dust prevention and control, site cleanup, removing & installing storm headwall, storm concrete channel, removing and installing storm pipes, removing and installing storm drain inlets, rip-rap, erosion control, and all other work as shown on the Plans and as called for in the Technical Provisions and as directed by the Engineer. https://www.cityofsancarlos.org/bid_detail_T4_R105.php

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT