Access the Full Project by Clicking here!
Bidjugde
JOB
State Route 47 Vincent Thomas Bridge Front Street Harbor Boulevard Interchange Reconfiguration
BID DATE
10/24/23 - 2:45
AGENCY
Los Angeles
ESTIMATE
$80,000,000
SCOPE
Register on PlanetBids: Project consists of Work as shown on Drawing Nos. 1-3481 and 1-3077. Work as shown on Drawing No. 1-3481 California Department of Transportation (Caltrans) Project No. 07150003041 and City of Los Angeles Bureau of Engineering Work BR 600523) consists of replacement of the existing southbound (SB) off-ramp from Vincent Thomas Bridge (VTB) currently located on the south side of VTB, with a new off-ramp to be located on the north side of VTB, realignment of the existing northbound (NB) on-ramp onto the SR 47 and I-110 connector, modification of SB off-ramp onto Harbor Boulevard, and modification of NB on-ramp onto VTB toward Terminal Island. Work also includes settlement mitigation along new NB SR-47 on and off ramp (including temporary and permanent site drainage, specialty retaining walls, utility relocation, and the like); Front Street B-Permit No. BR 6000523 civil and traffic improvements; and Port Inspection Facility reconfiguration. Work as shown on Drawing No. 1-3077 consists of improvements along the west side of Front Street from Pacific Avenue down to Swinford Street, including removals, landscaping, irrigation, fencing, paving, and storm drains landscape. Engineering Estimate: $70,000,000 - $80,000,000 https://www.rampla.org/s/opportunity-details?id=0066g00003f4Hf6 lwalsh@portla.org
UPDATES