JOB
Lindon 400 North PRA Turnout
BID DATE
08/17/23 - 2:00
AGENCY
Lindon
ESTIMATE
n/a
SCOPE
The Work consists of constructing a secondary (irrigation) water turnout / flow control / meter vault and pipe to deliver water from Provo River Aqueduct Pipe (PRA) to Provo Bench Canal at 400 North Lindon. It includes adding a collared 20-inch steel pipe welded outlet to a 126” steel pipe (PRA), sandblasting off existing Futura Protect II polyurethane lining and coating), sandblasting welded outlet (inside and outside), polyurethane relining (NSF 61) and recoating, CLSM backfill; buried 20-inch valve; cast in place reinforced concrete flow control / meter vault, functionally connecting vault to existing PRA fiberoptic / SCADA system; a new electric services and meter; controls, fan, lights, sump pump, hatch entry detection; approximately 980 feet of 20-inch (or 22- or 24-inch) and 24-inch HDPE DR 26 (or DR 21) pipeline; excavation and backfill, locating existing utilities, adjusting pipe profile in conformance with pipe deflection allowances, relocating conflicting utilities, precast concrete energy dissipator box with vent, connection to 48” Provo Bench Canal, repaving road, regrading and revegetating PRA ROW, startup and testing, and other Work. Juan Garrido +1 801-796-7954 jgarrido@lindoncity.org
PREBID
8/3/2023 1:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT