Maroon Bell Winchester Water Main Replacement
BID DATE
08/17/23 - 2:00
AGENCY
Chino Hills
ESTIMATE
$2,360,000
SCOPE
The work comprises, but is not limited to: mobilization; traffic control; installation of approximately 3,900 LF of 8-inch PVC C900 DR 14 pipe, including gate valves, fixtures, appurtenances, thrust blocks, blow offs, and air vac assemblies, and removal of portions of existing pipe. In addition, the work consists of installation of 111 ea 1-inch copper water service laterals and connecting to existing meters; installation of fire hydrants and valve assemblies, abandon-in-place existing water mains, pressure testing, disinfection, BacTs; trenching and pavement restoration, crack seal, slurry seal application, replacement of concrete cross gutter, speed hump, and restoration of pavement markings, raised markers, and striping; and other necessary work to complete the water replacement and street improvements. frama@chinohills.org engineering@chinohills.org https://www.chinohills.org/Bids.aspx?BidID=454
PREBID
8/2/2023 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT