Access the Full Project by Clicking here!
Bidjugde
JOB
Connecting Winchell Neighborhood Butler 8th Orange Lowe Signals
BID DATE
08/8/23 - 3:00
AGENCY
Fresno
ESTIMATE
n/a
SCOPE
The demolition of existing asphalt curb, sidewalk, and ramps; and the construction of curb, gutter, sidewalk, assessable ramps, and traffic signals at the intersection of Butler Ave and 8th Ave, and Orange Ave and Lowe Ave. Sherri Cuadros 559-621-1151 sherri.cuadros@fresno.gov https://pbsystem.planetbids.com/portal/14769/bo/bo-detail/107546
PREBID
7/20/2023 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT