Access the Full Project by Clicking here!
Bidjugde
JOB
Forest Creek Wastewater Treatment Plant 1 0 Mgd Expansion
BID DATE
08/30/23 - 3:00
AGENCY
Williamson County
ESTIMATE
$22,000,000
SCOPE
Tree and Brush Removal Site work Wastewater Lift Station 1.0 MGD Wastewater Treatment Plant Expansion Demo and replace Electrical and SCADA Modification to the existing Eaton Motor Control Center Excavation, Hauling and Off-Site Disposal of Native Soil Modification to Existing 0.99 MGD Wastewater Treatment Plant Sludge Dewatering Building including Screw Press Demolition and Dispose of existing Aerobic Digester Decommissioning of the Existing Wastewater Lift Station after the Proposed 1 MGD Wastewater Treatment Plant is put into service. Demolish 715 L.F. of existing 9 foot high Chain Link Security Fence 998 L.F. of 9 foot high Hunter Green Vinyl Coated Chain-Link Security Fence. Installation and Removal of Silt Fence for Erosion Control. Stabilized Construction Entrance Located at Entry Gate. SWPPP Restoration and Revegetation Construction Testing Trench Safety Systems Construction Staking Project Sign https://www.civcastusa.com/project/64a725b528e9bdef73f4a54c/summary cheryl@sdkallman.com
UPDATES