Stadium Drive Drainage Improvements
BID DATE
08/3/23 - 2:00
AGENCY
Bell County
ESTIMATE
n/a
SCOPE
This project includes demolition of the existing concrete drainage channel and reconstructing it with a storm sewer system. This system consists of 5’ curb inlets, runs of 8’x3’ RCBs and 3’x3’ RCBs, as well as runs of 18” RCP and 30” RCP as well as a 16’x18’ and a 22’x8’ Junction box. Along with the storm sewer improvements, 65’ of SDR26 Wastewater line is to be installed with 35’ of steel encasement under the drainage structures, along with a doghouse manhole. https://www.civcastusa.com/project/64ac06a327e692b64c291e95/summary jsimcik@kpaengineers.com