Access the Full Project by Clicking here!
Bidjugde
JOB
West Area Wastewater Pipeline Improvements
BID DATE
08/22/23 - 1:30
AGENCY
Casa Grande
ESTIMATE
n/a
SCOPE
New dual force mains and effluent (RWDS) pipelines are consolidated into one trench along Kortsen Road with installation going under a highway and railroad utilizing Jack and Bore (52” steel casing). The RWDS is a new 21,040 LF pressurized effluent line (24” and 30”) routed from the WRF to Bianco Road southwest of the WRF with a new Arizona Pollutant Elimination System (AZPDES) permit for the ability to discharge excess Class A+ effluent to the North Branch of the Santa Cruz Wash and Santa Cruz River. The force main features 13,050 LF of dual 18” HDPE pipeline routed from the new lift station to the existing WRF. In addition, 5,020 LF of 36” HDPE sewer interceptor along Bianco Road will intersect with 2,686 LF of 18” HDPE sewer lateral pipeline along Kortsen Road to combine within a 42” pipe which will convey wastewater to the new lift station. Jay_VanEcho@casagrandeaz.gov https://www.casagrandeaz.gov/bids.aspx?bidID=10
PREBID
7/20/2023 9:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT