Access the Full Project by Clicking here!
Bidjugde
JOB
Rock Canyon Aquifer Storage Booster Station Transmission Line
BID DATE
09/7/23 - 4:00
AGENCY
Provo
ESTIMATE
n/a
SCOPE
The Work generally includes, but is not limited to, the following: 1. Pump station construction including, all mechanical, electrical, plumbing, structural, civil, and architectural. 2. Pipe connections to existing water mains located at the pump station. 3. Water main construction from the pump station to Rock Canyon. 4. One pipe outlet in Rock Canyon. 5. Three underground vaults. 6. Commissioning of the system. 7. Decommissioning and demolition of an existing pump station. Shane Jones +801 (852) 6773 sjones@provo.org Barry Prettyman +1 801-852-6786 bprettyman@provo.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT