Taylor Lake Water Line Crossing Red Bluff
BID DATE
06/27/23 - 10:00
AGENCY
Seabrook
ESTIMATE
$2,900,000
SCOPE
This project will replace the existing water line that crosses Taylor Lake along Red Bluff Road that is attached to the bridge with a new horizontal directionally drilled water line under the lake. There will be approximately 1,400 linear feet of open cut or auger construction and an approximately 1,700 linear foot horizontal directionally drilled crossing under Taylor Lake. Installation of a meter vault and lateral connection to a City of Pasadena water line are also included. The proposed work will be in Harris County Right-of-Way along the road and in State of Texas Right-of-Way under Taylor Lake. kshannahan@seabrooktx.gov https://www.civcastusa.com/project/649c4532e9333763464e335a/summary